Stage build and rigging for a large-scale live event

Dhwani Entertainment

Staging

2,000 feet of Prolyte truss. Custom prosceniums. 24 chain hoists. The structure everything else depends on.

Staging Production

What We Deliver

The Farhan Akhtar stage build started 72 hours before the show. A 60-foot proscenium with integrated LED side panels, overhead lighting truss rated for 4 tonnes of fixtures, PA fly points for the K2 arrays, and a stage deck that needed to support a 12-piece band, backline, and 30,000 watts of amplification.

On day two, the ground survey revealed soft soil on stage left that hadn't been flagged in the site recce. Our structural engineer recalculated the load distribution overnight, and the crew re-positioned the base plates with wider footprints by 6am. The stage passed safety inspection at noon. The show went ahead as planned.

Every Dhwani stage build starts with structural engineering — load calculations for dead load (equipment), live load (performers), and wind load (outdoor venues in India see everything from dust storms to pre-monsoon gusts). Prolyte H40V truss rated to TUV standards. CM Lodestar chain hoists with dual braking. Mojo Barriers for front-of-stage crowd management. But the difference between a stage that's built and a stage that's engineered is the soil test at 2am.

Capabilities

Technical Excellence

Custom Stage Builds

Bespoke stage designs from concept to construction

Roof Structures

Weather-protected staging with integrated rigging points

Barricading

Front-of-stage barriers and crowd management infrastructure

Rigging

Overhead rigging systems for lighting, sound, and video elements

Load Engineering

Structural calculations ensuring safety at every point

The Gear Behind The Production

Our Arsenal

In-house inventory means faster deployment, lower costs, and zero vendor dependencies.

Stage construction in progress with crew
Stage Construction — 72hr Build
Truss and rigging system overhead
Truss & Rigging Systems
Front-of-stage barricading at a large event
Crowd Barricading
Completed stage with full production ready for show
Show-Ready — Full Production
Prolyte Milos Litec CM Lodestar Area Four
2000+
ft Truss Inventory
24
Chain Hoists
5000+
sqft Stage Deck